BEAUCHAMP 2 SOLAR (1543)

BEAUCHAMP 2 SOLAR is a 150.0 MW solar+battery interconnection project in Colusa, California with a current status of withdrawn. It is proposed to connect at Cortina Substation 115kV.

150.0 MWCapacity
WithdrawnStatus
Market
Solar+BatteryTechnology

Project facts

Canonical nameBEAUCHAMP 2 SOLAR
Queue ID1543
Statuswithdrawn
Source statusWITHDRAWN
Market
TechnologySolar+Battery
Capacity150.0 MW
StateCalifornia
CountyColusa
Point of interconnectionCortina Substation 115kV
Requested (queue) date2019-04-15
Proposed in-service date
Operational date
Withdrawn date2020-03-04
Developer
Utility / transmission ownerPGAE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: California ISO — public interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata