Beaver County 345 kV (GEN-2014-019)
Beaver County 345 kV is a 15.0 MW wind interconnection project in Ochiltree, Texas with a current status of withdrawn. It is proposed to connect at Beaver County 345 kV.
15.0 MWCapacity
WithdrawnStatus
TXMarket
WindTechnology
Project facts
| Canonical name | Beaver County 345 kV |
|---|---|
| Queue ID | GEN-2014-019 |
| Status | withdrawn |
| Source status | WITHDRAWN |
| Market | TX |
| Technology | Wind |
| Capacity | 15.0 MW |
| State | Texas |
| County | Ochiltree |
| Point of interconnection | Beaver County 345 kV |
| Requested (queue) date | 2014-07-08 |
| Proposed in-service date | — |
| Operational date | — |
| Withdrawn date | 2015-03-02 |
| Developer | — |
| Utility / transmission owner | OGE |
Cross-source records
This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-07-31 | new_project | — | withdrawn | high |
Explore related data
Source last checked2026-08-28
Data last materially changed2026-08-28
Page data generated2026-08-28
Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata