Ochiltree County, Texas — Interconnection Projects
The interXdata warehouse tracks 4 interconnection projects in Ochiltree, Texas, representing 747 MW of requested capacity.
4Total projects
1Active
1Operational
2Withdrawn
747 MWRequested capacity
Technology mix
| Technology | Projects | Requested capacity |
|---|---|---|
| Wind | 3 | 597 MW |
| Battery | 1 | 150 MW |
Projects
| Project | Queue ID | Technology | Capacity | Status | Location |
|---|---|---|---|---|---|
| Hitchland-Woodward EHV Dbl Ckt (Beaver County) 345kV | GEN-2013-030 | Wind | 300.0 MW | withdrawn | Ochiltree, Texas |
| Palo Duro Wind | 59475_GE1.7 | Wind | 282.3 MW | operational | Ochiltree, Texas |
| Palo Duro Energy Storage | 70199_PALO1 | Battery | 150.0 MW | active | Ochiltree, Texas |
| Beaver County 345 kV | GEN-2014-019 | Wind | 15.0 MW | withdrawn | Ochiltree, Texas |
Top developers
Developer attribution is not yet resolved for this set.
Explore related data
Source last checked2026-07-31
Data last materially changed2026-08-27
Page data generated2026-08-27
Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned); Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Get an alert when a new project is proposed in Ochiltree County.