Ochiltree County, Texas — Interconnection Projects

The interXdata warehouse tracks 4 interconnection projects in Ochiltree, Texas, representing 747 MW of requested capacity.

4Total projects
1Active
1Operational
2Withdrawn
747 MWRequested capacity

Technology mix

TechnologyProjectsRequested capacity
Wind3597 MW
Battery1150 MW

Projects

ProjectQueue IDTechnologyCapacityStatusLocation
Hitchland-Woodward EHV Dbl Ckt (Beaver County) 345kVGEN-2013-030Wind300.0 MWwithdrawnOchiltree, Texas
Palo Duro Wind59475_GE1.7Wind282.3 MWoperationalOchiltree, Texas
Palo Duro Energy Storage70199_PALO1Battery150.0 MWactiveOchiltree, Texas
Beaver County 345 kVGEN-2014-019Wind15.0 MWwithdrawnOchiltree, Texas

Top developers

Developer attribution is not yet resolved for this set.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned); Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.