Beaver Kill Storage (C24-142)

Beaver Kill Storage is a 12.0 MW battery interconnection project in Ulster, New York with a current status of withdrawn. It is proposed to connect at CHGE SAUGERTIES Substation, Feeder 3003, 13.8kV.

12.0 MWCapacity
WithdrawnStatus
NYISOMarket
BatteryTechnology

Project facts

Canonical nameBeaver Kill Storage
Queue IDC24-142
Statuswithdrawn
Source statuswithdrawn
MarketNYISO
TechnologyBattery
Capacity12.0 MW
StateNew York
CountyUlster
Point of interconnectionCHGE SAUGERTIES Substation, Feeder 3003, 13.8kV
Requested (queue) date2024-09-09
Proposed in-service date
Operational date
Withdrawn date
DeveloperNexus Renewables U.S. Inc.
Utility / transmission ownerNYISO

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata