Beck_Road BESS1 (25INR0717)
Beck_Road BESS1 is a 10.0 MW battery interconnection project in Bexar, Texas with a current status of active. It is proposed to connect at TSP Station Name: Beck Road TSP Station Code: Z0 Load Name / Load Transformer Name: LXFMR3 Bus #: PTI Bus Number: 5035 Voltage (Transmission level kV): 138 Node (associated w/ load/load XFMR in NMMS): 0001.
Project facts
| Canonical name | Beck_Road BESS1 |
|---|---|
| Queue ID | 25INR0717 |
| Status | active |
| Source status | active |
| Market | ERCOT |
| Technology | Battery |
| Capacity | 10.0 MW |
| State | Texas |
| County | Bexar |
| Point of interconnection | TSP Station Name: Beck Road TSP Station Code: Z0 Load Name / Load Transformer Name: LXFMR3 Bus #: PTI Bus Number: 5035 Voltage (Transmission level kV): 138 Node (associated w/ load/load XFMR in NMMS): 0001 |
| Requested (queue) date | 2025-07-11 |
| Proposed in-service date | 2026-01-01 |
| Operational date | — |
| Withdrawn date | — |
| Developer | Bexar Corrilla LLC |
| Utility / transmission owner | ERCOT |
What changed
No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.
Explore related data
Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata