Beck_Road BESS1 (25INR0717)

Beck_Road BESS1 is a 10.0 MW battery interconnection project in Bexar, Texas with a current status of active. It is proposed to connect at TSP Station Name: Beck Road TSP Station Code: Z0 Load Name / Load Transformer Name: LXFMR3 Bus #: PTI Bus Number: 5035 Voltage (Transmission level kV): 138 Node (associated w/ load/load XFMR in NMMS): 0001.

10.0 MWCapacity
ActiveStatus
ERCOTMarket
BatteryTechnology

Project facts

Canonical nameBeck_Road BESS1
Queue ID25INR0717
Statusactive
Source statusactive
MarketERCOT
TechnologyBattery
Capacity10.0 MW
StateTexas
CountyBexar
Point of interconnectionTSP Station Name: Beck Road TSP Station Code: Z0 Load Name / Load Transformer Name: LXFMR3 Bus #: PTI Bus Number: 5035 Voltage (Transmission level kV): 138 Node (associated w/ load/load XFMR in NMMS): 0001
Requested (queue) date2025-07-11
Proposed in-service date2026-01-01
Operational date
Withdrawn date
DeveloperBexar Corrilla LLC
Utility / transmission ownerERCOT

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.