Beckjord 2 MW-2 (Y3-100)

Beckjord 2 MW-2 is a 2.0 MW battery interconnection project in Clermont, Ohio with a current status of withdrawn.

2.0 MWCapacity
WithdrawnStatus
Market
BatteryTechnology

Project facts

Canonical nameBeckjord 2 MW-2
Queue IDY3-100
Statuswithdrawn
Source statusDeactivated
Market
TechnologyBattery
Capacity2.0 MW
StateOhio
CountyClermont
Point of interconnection
Requested (queue) date2013-04-29
Proposed in-service date2015-10-01
Operational date
Withdrawn date
Developer
Utility / transmission ownerDEOK

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.