Bedias Solar Park (25INR0126)

Bedias Solar Park is a 400.0 MW solar interconnection project in Grimes, Texas with a current status of withdrawn. It is proposed to connect at 44645 Singleton 345kV.

400.0 MWCapacity
WithdrawnStatus
ERCOTMarket
SolarTechnology

Project facts

Canonical nameBedias Solar Park
Queue ID25INR0126
Statuswithdrawn
Source statuswithdrawn
MarketERCOT
TechnologySolar
Capacity400.0 MW
StateTexas
CountyGrimes
Point of interconnection44645 Singleton 345kV
Requested (queue) date2023-10-25
Proposed in-service date2026-06-30
Operational date
Withdrawn date2023-10-25
DeveloperMisae Energy III
Utility / transmission ownerERCOT

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata