Beechwood DP-Palmer Springs 115 kV (AB2-089)

Beechwood DP-Palmer Springs 115 kV is a 20.0 MW solar interconnection project in Mecklenburg, Virginia with a current status of withdrawn.

20.0 MWCapacity
WithdrawnStatus
Market
SolarTechnology

Project facts

Canonical nameBeechwood DP-Palmer Springs 115 kV
Queue IDAB2-089
Statuswithdrawn
Source statusWithdrawn
Market
TechnologySolar
Capacity20.0 MW
StateVirginia
CountyMecklenburg
Point of interconnection
Requested (queue) date2016-04-25
Proposed in-service date2017-06-01
Operational date
Withdrawn date2019-07-24
Developer
Utility / transmission ownerDominion

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata