Belding 2 Batt (21INR0495)

Belding 2 Batt is a 51.5 MW other interconnection project in Pecos, Texas with a current status of withdrawn. It is proposed to connect at 38490 TNBelding 69kV_x000D_ .

51.5 MWCapacity
WithdrawnStatus
ERCOTMarket
OtherTechnology

Project facts

Canonical nameBelding 2 Batt
Queue ID21INR0495
Statuswithdrawn
Source statuswithdrawn
MarketERCOT
TechnologyOther
Capacity51.5 MW
StateTexas
CountyPecos
Point of interconnection38490 TNBelding 69kV_x000D_
Requested (queue) date2020-03-25
Proposed in-service date2024-07-15
Operational date
Withdrawn date2023-12-07
DeveloperTriple Butte
Utility / transmission ownerERCOT

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata