Bellefield 2 Solar & Energy Storage Farm (64209_26SBB)

Bellefield 2 Solar & Energy Storage Farm is a 500.0 MW battery interconnection project in Kern, California with a current status of active.

500.0 MWCapacity
ActiveStatus
CISOMarket
BatteryTechnology

Project facts

Canonical nameBellefield 2 Solar & Energy Storage Farm
Queue ID64209_26SBB
Statusactive
Source status(V) Under construction, more than 50 percent complete
MarketCISO
TechnologyBattery
Capacity500.0 MW
StateCalifornia
CountyKern
Point of interconnection—
Requested (queue) date—
Proposed in-service date2026-12-01
Operational date—
Withdrawn date—
Developer—
Utility / transmission owner26SB 8me LLC

What changed

ObservedFieldOld valueNew valueMateriality
2026-10-02proposed_online_date2026-11-012026-12-01medium
2026-08-02new_project—activehigh

Explore related data

Source last checked2026-10-02
Data last materially changed2026-10-02
Page data generated2026-10-12

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.