Belltown Bio (0324)

Belltown Bio is a 2.0 MW other interconnection project in Cayuga, New York with a current status of withdrawn. It is proposed to connect at King Ferry.

2.0 MWCapacity
WithdrawnStatus
CMarket
OtherTechnology

Project facts

Canonical nameBelltown Bio
Queue ID0324
Statuswithdrawn
Source status0
MarketC
TechnologyOther
Capacity2.0 MW
StateNew York
CountyCayuga
Point of interconnectionKing Ferry
Requested (queue) date2009-03-06
Proposed in-service date2009-04-08
Operational date
Withdrawn date
DeveloperBelltown Biogas, LLC
Utility / transmission ownerNYSEG

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: New York ISO — interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.