Benton County 115kV Substation (J1426)

Benton County 115kV Substation is a 100.0 MW solar interconnection project in Benton County, Minnesota with a current status of operational. It is proposed to connect at Benton County 115kV Substation.

100.0 MWCapacity
OperationalStatus
Market
SolarTechnology

Project facts

Canonical nameBenton County 115kV Substation
Queue IDJ1426
Statusoperational
Source statusDone
Market
TechnologySolar
Capacity100.0 MW
StateMinnesota
CountyBenton County
Point of interconnectionBenton County 115kV Substation
Requested (queue) date2019-04-29
Proposed in-service date2022-08-01
Operational date2022-08-01
Withdrawn date
Developer
Utility / transmission ownerGREAT RIVER ENERGY

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectoperationalhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata