Berrians East Replacement (0393)

Berrians East Replacement is a 94.2 MW other interconnection project in Queens, New York with a current status of withdrawn. It is proposed to connect at Astoria East 138kV Substation .

94.2 MWCapacity
WithdrawnStatus
JMarket
OtherTechnology

Project facts

Canonical nameBerrians East Replacement
Queue ID0393
Statuswithdrawn
Source status0
MarketJ
TechnologyOther
Capacity94.2 MW
StateNew York
CountyQueens
Point of interconnectionAstoria East 138kV Substation
Requested (queue) date2012-10-16
Proposed in-service date2023-01-31
Operational date
Withdrawn date
DeveloperNRG Energy, Inc.
Utility / transmission ownerCONED

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: New York ISO — interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.