Bestla Solar is a 180.0 MW solar interconnection project in Winkler, Texas with a current status of suspended.

180.0 MWCapacity
SuspendedStatus
WinklerMarket
SolarTechnology

Project facts

Canonical nameBestla Solar
Queue ID19INR0031
Statussuspended
Source status
MarketWinkler
TechnologySolar
Capacity180.0 MW
StateTexas
CountyWinkler
Point of interconnection
Requested (queue) date
Proposed in-service date
Operational date
Withdrawn date
Developer
Utility / transmission ownerERCOT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectsuspendedhigh

Explore related data

Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-28

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.