Winkler County, Texas — Interconnection Projects
The interXdata warehouse tracks 8 interconnection projects in Winkler, Texas, representing 1,112 MW of requested capacity.
8Total projects
1Active
3Operational
3Withdrawn
1,112 MWRequested capacity
Technology mix
| Technology | Projects | Requested capacity |
|---|---|---|
| Solar | 6 | 895 MW |
| Other | 1 | 207 MW |
| Gas | 1 | 10 MW |
Projects
| Project | Queue ID | Technology | Capacity | Status | Location |
|---|---|---|---|---|---|
| Phoebe Solar | 19INR0029 | Solar | 250.0 MW | operational | Winkler, Texas |
| Phoebe Solar | 61906_PHOEB | Solar | 250.0 MW | operational | Winkler, Texas |
| BRP Volans BESS | 23INR0071 | Other | 206.9 MW | operational | Winkler, Texas |
| Bestla Solar | 19INR0031 | Solar | 180.0 MW | suspended | Winkler, Texas |
| Winkler Solar | 18INR0022 | Solar | 150.0 MW | withdrawn | Winkler, Texas |
| Rosie Solar | 25INR0240 | Solar | 61.0 MW | withdrawn | Winkler, Texas |
| Coyanosa Gas | 25INR0711 | Gas | 9.9 MW | active | Winkler, Texas |
| SIXTY SIX Solar | 20INR0274 | Solar | 3.8 MW | withdrawn | Winkler, Texas |
Top developers
| Developer (canonical) | Projects | Capacity |
|---|---|---|
| BRP Volans BESS LLC | 1 | 207 MW |
| RES Americas | 1 | 150 MW |
| RPC Merchant, LLC | 1 | 10 MW |
| MERIT SI DEVELOPMENT, LLC | 1 | 4 MW |
| Longroad Energy | 1 | 250 MW |
| Industrial Delta Project LLC | 1 | 61 MW |
Explore related data
Source last checked2026-07-31
Data last materially changed2026-08-27
Page data generated2026-08-27
Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned); ERCOT — Generation Interconnection Status (GIS) report; Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Get an alert when a new project is proposed in Winkler County.
Start tracking with interXdata