Bethpage Battery Storage Project (C24-265)

Bethpage Battery Storage Project is a 44.0 MW battery interconnection project in Nassau, New York with a current status of withdrawn. It is proposed to connect at LIPA Grumann B 69 kV Substation.

44.0 MWCapacity
WithdrawnStatus
NYISOMarket
BatteryTechnology

Project facts

Canonical nameBethpage Battery Storage Project
Queue IDC24-265
Statuswithdrawn
Source statuswithdrawn
MarketNYISO
TechnologyBattery
Capacity44.0 MW
StateNew York
CountyNassau
Point of interconnectionLIPA Grumann B 69 kV Substation
Requested (queue) date2024-09-23
Proposed in-service date
Operational date
Withdrawn date
DeveloperCalpine Energy Services, L.P.
Utility / transmission ownerLIPA

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-28

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.