Big Bend (645_GT5)

Big Bend is a 397.8 MW gas interconnection project in Hillsborough, Florida with a current status of operational.

397.8 MWCapacity
OperationalStatus
TECMarket
GasTechnology

Project facts

Canonical nameBig Bend
Queue ID645_GT5
Statusoperational
Source status(OP) Operating
MarketTEC
TechnologyGas
Capacity397.8 MW
StateFlorida
CountyHillsborough
Point of interconnection—
Requested (queue) date—
Proposed in-service date—
Operational date2021-12-01
Withdrawn date—
Developer—
Utility / transmission ownerTampa Electric Company

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_project—operationalhigh

Explore related data

Source last checked2026-10-02
Data last materially changed2026-10-02
Page data generated2026-10-11

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata