Big Elm Solar (21INR0353)
Big Elm Solar is a 201.0 MW solar+battery interconnection project in Bell, Texas with a current status of operational. It is proposed to connect at 345kV #3404 Belfalls Switch.
201.0 MWCapacity
OperationalStatus
ERCOTMarket
Solar+BatteryTechnology
Project facts
| Canonical name | Big Elm Solar |
|---|---|
| Queue ID | 21INR0353 |
| Status | operational |
| Source status | operational |
| Market | ERCOT |
| Technology | Solar+Battery |
| Capacity | 201.0 MW |
| State | Texas |
| County | Bell |
| Point of interconnection | 345kV #3404 Belfalls Switch |
| Requested (queue) date | 2019-06-26 |
| Proposed in-service date | 2025-04-11 |
| Operational date | 2025-04-30 |
| Withdrawn date | — |
| Developer | Big Elm Solar, LLC |
| Utility / transmission owner | ERCOT |
What changed
No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.
Explore related data
Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27
Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata