Big Spring Wind Power Facility (54979_WIND)

Big Spring Wind Power Facility is a 34.3 MW wind interconnection project in Howard, Texas with a current status of operational.

34.3 MWCapacity
OperationalStatus
ERCOMarket
WindTechnology

Project facts

Canonical nameBig Spring Wind Power Facility
Queue ID54979_WIND
Statusoperational
Source status(OP) Operating
MarketERCO
TechnologyWind
Capacity34.3 MW
StateTexas
CountyHoward
Point of interconnection
Requested (queue) date
Proposed in-service date
Operational date1998-12-01
Withdrawn date
Developer
Utility / transmission ownerTerra-Gen Operating Co-Wind

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_projectoperationalhigh

Explore related data

Source last checked2026-08-03
Data last materially changed2026-08-03
Page data generated2026-08-27

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata