The interXdata warehouse tracks 34 interconnection projects in Howard, Texas, representing 3,819 MW of requested capacity.
34Total projects
1Active
27Operational
5Withdrawn
3,819 MWRequested capacity
Technology mix
| Technology | Projects | Requested capacity |
|---|---|---|
| Other | 15 | 2,071 MW |
| Solar | 7 | 608 MW |
| Wind | 6 | 493 MW |
| Battery | 3 | 416 MW |
| Gas | 3 | 230 MW |
Projects
| Project | Queue ID | Technology | Capacity | Status | Location |
|---|---|---|---|---|---|
| Infinium Solar | 29INR0019 | Solar | 401.6 MW | operational | Howard, Texas |
| Crater BESS | 22INR0347 | Other | 310.3 MW | operational | Howard, Texas |
| Bhalu Storage | 26INR0301 | Other | 205.5 MW | operational | Howard, Texas |
| Les Energy Storage | 25INR0338 | Other | 205.1 MW | operational | Howard, Texas |
| Carolina Storage Midland | 25INR0629 | Other | 204.7 MW | operational | Howard, Texas |
| Prospector Energy Storage | 26INR0485 | Other | 204.6 MW | operational | Howard, Texas |
| Carolina Storage Odessa | 25INR0611 | Other | 202.8 MW | operational | Howard, Texas |
| Fairgreen BESS | 25INR0141 | Battery | 201.1 MW | withdrawn | Howard, Texas |
| Bhalu | 67652_BHALU | Battery | 200.0 MW | active | Howard, Texas |
| Rattlesnake Gap Wind SLF | 29INR0177 | Other | 200.0 MW | operational | Howard, Texas |
| Panther Creek Wind Farm I | 56920_1 | Wind | 142.5 MW | operational | Howard, Texas |
| Prairie Blossom Storage | 27INR0323 | Other | 122.5 MW | operational | Howard, Texas |
| Elbow Creek Wind Project LLC | 56783_1 | Wind | 121.9 MW | operational | Howard, Texas |
| Gunsight Mountain Wind Energy LLC | 56776_1 | Wind | 120.0 MW | operational | Howard, Texas |
| Calf Creek Storage | 27INR0325 | Other | 103.3 MW | operational | Howard, Texas |
| Luthor Solar | 25INR0106 | Solar | 101.0 MW | operational | Howard, Texas |
| Ariji BESS | 25INR0143 | Other | 100.3 MW | operational | Howard, Texas |
| Llano Estacado Energy Storage | 24INR0231 | Other | 98.0 MW | withdrawn | Howard, Texas |
| C R Wing Cogen Plant | 52176_GEN2 | Gas | 77.5 MW | operational | Howard, Texas |
| C R Wing Cogen Plant | 52176_GEN1 | Gas | 77.5 MW | operational | Howard, Texas |
| C R Wing Cogen Plant | 52176_GEN3 | Gas | 75.0 MW | operational | Howard, Texas |
| PRI Solar | 28INR0419 | Solar | 63.8 MW | operational | Howard, Texas |
| Llano Estacado BESS | 22INR0464 | Other | 60.0 MW | withdrawn | Howard, Texas |
| Ocotillo Windpower | 56959_OWF | Wind | 58.8 MW | operational | Howard, Texas |
| Silver Hills Windpower | 27INR0512 | Other | 54.0 MW | operational | Howard, Texas |
| Big Spring Wind Power Facility | 54979_WIND | Wind | 34.3 MW | operational | Howard, Texas |
| Delek Big Spring Solar | 27INR0357 | Solar | 21.4 MW | withdrawn | Howard, Texas |
| Panther Creek III Repower | 21INR0449 | Wind | 16.0 MW | operational | Howard, Texas |
| Delek Big Spring Storage | 27INR0358 | Battery | 15.3 MW | withdrawn | Howard, Texas |
| Highpeak Solar 1 | 66572_HPKS1 | Solar | 10.0 MW | operational | Howard, Texas |
| Wildhorse POD Solar | 23INR0537 | Solar | 10.0 MW | suspended | Howard, Texas |
| Rattlesnake Gap Storage SLF | 29INR0179 | Other | 0.0 MW | operational | Howard, Texas |
| Elbow Creek repower | 19INR0174 | Other | 0.0 MW | operational | Howard, Texas |
| Rattlesnake Gap Solar SLF | 29INR0178 | Solar | 0.0 MW | operational | Howard, Texas |
Top developers
| Developer (canonical) | Projects | Capacity |
|---|---|---|
| ET Fuels US Inc. | 3 | 200 MW |
| CSE Storage, LLC | 2 | 408 MW |
| VESI 37 LLC | 2 | 158 MW |
| TotalEnergies Distributed Generation, LLC | 2 | 37 MW |
| Elbow Creek Wind Project, LLC | 1 | 0 MW |
| BRP Crater BESS LLC | 1 | 310 MW |
| Ariji BESS, LLC | 1 | 100 MW |
| Silver Hills Windpower, LLC | 1 | 54 MW |
| Prairie Blossom Storage, LLC | 1 | 122 MW |
| Bhalu Storage, LLC | 1 | 206 MW |
| Fairgreen BESS, LLC | 1 | 201 MW |
| BHER Power Resources, Inc | 1 | 64 MW |
| Rocky Mountain Energy Development, LLC | 1 | 205 MW |
| TREX US Luthor LLC | 1 | 101 MW |
| Coyote Ridge Storage, LLC | 1 | 103 MW |
Explore related data
Source last checked2026-07-31
Data last materially changed2026-08-27
Page data generated2026-08-27
Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned); ERCOT — Generation Interconnection Status (GIS) report; Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Get an alert when a new project is proposed in Howard County.
Start tracking with interXdata