Birchwood-NUG 230 kV (AG2-199)

Birchwood-NUG 230 kV is a 55.0 MW solar interconnection project in King George, Virginia with a current status of withdrawn.

55.0 MWCapacity
WithdrawnStatus
Market
SolarTechnology

Project facts

Canonical nameBirchwood-NUG 230 kV
Queue IDAG2-199
Statuswithdrawn
Source statusWithdrawn
Market
TechnologySolar
Capacity55.0 MW
StateVirginia
CountyKing George
Point of interconnection
Requested (queue) date2021-03-01
Proposed in-service date2023-10-10
Operational date
Withdrawn date2024-12-18
Developer
Utility / transmission ownerDominion

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-28

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata