Bird Dog Energy Storage (22INR0467)

Bird Dog Energy Storage is a 60.4 MW other interconnection project in Live Oak, Texas with a current status of operational. It is proposed to connect at 5669 Argenta 69kV.

60.4 MWCapacity
OperationalStatus
Live OakMarket
OtherTechnology

Project facts

Canonical nameBird Dog Energy Storage
Queue ID22INR0467
Statusoperational
Source statusSS Completed, FIS Completed, IA
MarketLive Oak
TechnologyOther
Capacity60.4 MW
StateTexas
CountyLive Oak
Point of interconnection5669 Argenta 69kV
Requested (queue) date2021-02-04
Proposed in-service date
Operational date2026-06-30
Withdrawn date
DeveloperVESI 37 LLC
Utility / transmission ownerERCOT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-27

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata