Live Oak County, Texas — Interconnection Projects
The interXdata warehouse tracks 7 interconnection projects in Live Oak, Texas, representing 531 MW of requested capacity.
7Total projects
0Active
5Operational
1Withdrawn
531 MWRequested capacity
Technology mix
| Technology | Projects | Requested capacity |
|---|---|---|
| Solar | 5 | 430 MW |
| Other | 2 | 101 MW |
Projects
| Project | Queue ID | Technology | Capacity | Status | Location |
|---|---|---|---|---|---|
| Urca Solar | 24INR0292 | Solar | 204.1 MW | suspended | Live Oak, Texas |
| Anagram Solar | 25INR0621 | Solar | 130.6 MW | operational | Live Oak, Texas |
| Bird Dog Energy Storage | 22INR0467 | Other | 60.4 MW | operational | Live Oak, Texas |
| Brightside Solar Alt POI | 23INR0487 | Solar | 50.0 MW | operational | Live Oak, Texas |
| Buck Ranch Solar SLF | 27INR0375 | Solar | 40.8 MW | operational | Live Oak, Texas |
| Buck Ranch Storage SLF | 27INR0376 | Other | 40.8 MW | operational | Live Oak, Texas |
| CITY WEST Solar | 20INR0283 | Solar | 4.1 MW | withdrawn | Live Oak, Texas |
Top developers
| Developer (canonical) | Projects | Capacity |
|---|---|---|
| Buck Ranch Solar, LLC | 2 | 82 MW |
| VESI 37 LLC | 1 | 60 MW |
| MERIT SI DEVELOPMENT, LLC | 1 | 4 MW |
| Anagram Solar | 1 | 131 MW |
| Brightside Solar, LLC | 1 | 50 MW |
Explore related data
Source last checked2026-07-31
Data last materially changed2026-08-27
Page data generated2026-08-27
Provenance: ERCOT — Generation Interconnection Status (GIS) report; Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Get an alert when a new project is proposed in Live Oak County.
Start tracking with interXdata