Bird Dog Wind (19INR0144)

Bird Dog Wind is a 300.0 MW wind interconnection project in Borden, Texas with a current status of withdrawn. It is proposed to connect at 1301 Willow Valley 138kV.

300.0 MWCapacity
WithdrawnStatus
ERCOTMarket
WindTechnology

Project facts

Canonical nameBird Dog Wind
Queue ID19INR0144
Statuswithdrawn
Source statuswithdrawn
MarketERCOT
TechnologyWind
Capacity300.0 MW
StateTexas
CountyBorden
Point of interconnection1301 Willow Valley 138kV
Requested (queue) date2017-10-19
Proposed in-service date2019-10-01
Operational date
Withdrawn date2019-05-31
DeveloperAmericlean
Utility / transmission ownerERCOT

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata