Bison - Maurine 230 kV Substation (GEN-2022-066)

Bison - Maurine 230 kV Substation is a 150.0 MW solar interconnection project in Perkins, South Dakota with a current status of withdrawn. It is proposed to connect at Bison - Maurine 230 kV Substation.

150.0 MWCapacity
WithdrawnStatus
SDMarket
SolarTechnology

Project facts

Canonical nameBison - Maurine 230 kV Substation
Queue IDGEN-2022-066
Statuswithdrawn
Source statusWITHDRAWN
MarketSD
TechnologySolar
Capacity150.0 MW
StateSouth Dakota
CountyPerkins
Point of interconnectionBison - Maurine 230 kV Substation
Requested (queue) date2022-08-05
Proposed in-service date2028-02-15
Operational date
Withdrawn date2023-11-06
Developer
Utility / transmission ownerWAPA/BEPC/HCPD Integrated System

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.