BL England 138 kV (AE1-104)

BL England 138 kV is a 432.0 MW wind interconnection project in Cape May, New Jersey with a current status of suspended.

432.0 MWCapacity
SuspendedStatus
Market
WindTechnology

Project facts

Canonical nameBL England 138 kV
Queue IDAE1-104
Statussuspended
Source statusSuspended
Market
TechnologyWind
Capacity432.0 MW
StateNew Jersey
CountyCape May
Point of interconnection
Requested (queue) date2018-09-06
Proposed in-service date2026-02-28
Operational date
Withdrawn date
Developer
Utility / transmission ownerAEC

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectsuspendedhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata