Black Angus (20INR0064)

Black Angus is a 352.8 MW wind interconnection project in Webb, Texas with a current status of withdrawn. It is proposed to connect at tap 345kV 1730 WKrum - 6101 Riley.

352.8 MWCapacity
WithdrawnStatus
ERCOTMarket
WindTechnology

Project facts

Canonical nameBlack Angus
Queue ID20INR0064
Statuswithdrawn
Source statuswithdrawn
MarketERCOT
TechnologyWind
Capacity352.8 MW
StateTexas
CountyWebb
Point of interconnectiontap 345kV 1730 WKrum - 6101 Riley
Requested (queue) date2018-03-05
Proposed in-service date2020-12-15
Operational date
Withdrawn date2019-03-13
DeveloperApex Clean
Utility / transmission ownerERCOT

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.