Black Cherry BESS (C24-309)
Black Cherry BESS is a 400.0 MW battery interconnection project in Mckean, Pennsylvania with a current status of withdrawn. It is proposed to connect at Homer City to Piercebrook 345kV Line.
400.0 MWCapacity
WithdrawnStatus
NYISOMarket
BatteryTechnology
Project facts
| Canonical name | Black Cherry BESS |
|---|---|
| Queue ID | C24-309 |
| Status | withdrawn |
| Source status | withdrawn |
| Market | NYISO |
| Technology | Battery |
| Capacity | 400.0 MW |
| State | Pennsylvania |
| County | Mckean |
| Point of interconnection | Homer City to Piercebrook 345kV Line |
| Requested (queue) date | 2024-10-01 |
| Proposed in-service date | — |
| Operational date | — |
| Withdrawn date | — |
| Developer | Black Cherry Wind Power |
| Utility / transmission owner | NYSEG |
What changed
No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.
Explore related data
Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-28
Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata