Black Cherry Wind 1 (C24-298)

Black Cherry Wind 1 is a 350.0 MW wind interconnection project in Cameron, Pennsylvania with a current status of withdrawn. It is proposed to connect at Homer City - Piercebrook 345kV.

350.0 MWCapacity
WithdrawnStatus
NYISOMarket
WindTechnology

Project facts

Canonical nameBlack Cherry Wind 1
Queue IDC24-298
Statuswithdrawn
Source statuswithdrawn
MarketNYISO
TechnologyWind
Capacity350.0 MW
StatePennsylvania
CountyCameron
Point of interconnectionHomer City - Piercebrook 345kV
Requested (queue) date2024-09-29
Proposed in-service date
Operational date
Withdrawn date
DeveloperBlack Cherry Wind Power
Utility / transmission ownerNYSEG

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.