BLACK HILLS PLAYA B SOLAR (1652)

BLACK HILLS PLAYA B SOLAR is a 100.0 MW solar+battery interconnection project in Clark, Nevada with a current status of withdrawn. It is proposed to connect at Sloan Canyon Switching Station 230 kV.

100.0 MWCapacity
WithdrawnStatus
Market
Solar+BatteryTechnology

Project facts

Canonical nameBLACK HILLS PLAYA B SOLAR
Queue ID1652
Statuswithdrawn
Source statusWITHDRAWN
Market
TechnologySolar+Battery
Capacity100.0 MW
StateNevada
CountyClark
Point of interconnectionSloan Canyon Switching Station 230 kV
Requested (queue) date2019-04-15
Proposed in-service date
Operational date
Withdrawn date2019-07-24
Developer
Utility / transmission ownerGLW

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: California ISO — public interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.