GLW — Interconnection Queue Projects
GLW is associated with 44 tracked interconnection projects representing 15,979 MW of requested capacity.
Entity resolution: single source organization name; no cluster merge applied.
44Projects
24Active
1Operational
19Withdrawn
15,979 MWRequested capacity
1Markets
Capacity by technology
| Technology | Projects | Requested capacity |
|---|---|---|
| Solar+Battery | 30 | 11,828 MW |
| Solar | 10 | 2,849 MW |
| Battery | 4 | 1,302 MW |
Portfolio by market
| Market | Projects |
|---|---|
| CAISO | 19 |
Geographic footprint
| State | Projects |
|---|---|
| Nevada | 36 |
| California | 8 |
Projects
| Project | Queue ID | Technology | Capacity | Status | Location |
|---|---|---|---|---|---|
| Ashton Energy Center | 2290 | Solar+Battery | 1,026.7 MW | withdrawn | Nye, Nevada |
| Chance Solar | 2270 | Solar+Battery | 895.8 MW | withdrawn | Nye, Nevada |
| Borderline Solar | 2242 | Solar+Battery | 638.1 MW | withdrawn | Inyo, California |
| Reed Meadow | 2245 | Battery | 565.8 MW | withdrawn | Clark, Nevada |
| Campito Peak | 2211 | Battery | 565.8 MW | withdrawn | Inyo, California |
| Monte Cristo Solar 1 | 54991 | Solar | 552.9 MW | withdrawn | California |
| Monte Cristo Solar 2 | 54992 | Solar | 552.9 MW | withdrawn | California |
| Amargosa SEZ | 2283 | Solar+Battery | 510.4 MW | withdrawn | Nye, Nevada |
| WATER ROCK SOLAR 2 | 2146 | Solar+Battery | 500.0 MW | active | Nye, Nevada |
| MOSEY | 2148 | Solar+Battery | 500.0 MW | active | Clark, Nevada |
| SILVER STAR SOLAR | 2142 | Solar+Battery | 500.0 MW | active | Nye, Nevada |
| ROCK VALLEY ENERGY CENTER | 2144 | Solar+Battery | 500.0 MW | active | Nye, Nevada |
| SUNBAKED SOLAR | 2149 | Solar+Battery | 500.0 MW | active | Inyo, California |
| Bristlecone | 2257 | Solar+Battery | 460.9 MW | active | Nye, Nevada |
| SLOAN ENERGY CENTER | 1653 | Solar+Battery | 448.0 MW | withdrawn | Clark, Nevada |
| Solar 373 | 54676 | Solar+Battery | 407.0 MW | withdrawn | California |
| White Oak Solar | 2271 | Solar+Battery | 407.0 MW | withdrawn | Nye, Nevada |
| PURPLE SAGE ENERGY CENTER | 1800 | Solar+Battery | 400.0 MW | active | Clark, Nevada |
| BONANZA PEAK SOLAR FARM | 1655 | Solar+Battery | 400.0 MW | active | Clark/nye, Nevada |
| Cathedral | 2309 | Solar+Battery | 361.1 MW | withdrawn | Nye, Nevada |
| Goldlink | 2273 | Solar | 353.8 MW | active | Nye, Nevada |
| Onyx | 2291 | Solar+Battery | 353.1 MW | withdrawn | Clark, Nevada |
| KAWICH | 2147 | Solar+Battery | 350.0 MW | active | Clark, Nevada |
| Serenity | 2215 | Solar | 305.4 MW | active | Nye, Nevada |
| BONANZA SOLAR 2 | 1797 | Solar+Battery | 300.0 MW | withdrawn | Clark/nye, Nevada |
| BONANZA SOLAR | 1649 | Solar+Battery | 300.0 MW | active | Clark/nye, Nevada |
| LARREA SOLAR | 2150 | Solar+Battery | 300.0 MW | active | Clark, Nevada |
| HIDDEN HILLS SOLAR 1 | 1400 | Solar | 266.5 MW | withdrawn | Inyo, California |
| YELLOW PINE 3 | 1654 | Solar+Battery | 250.0 MW | active | Clark, Nevada |
| CALVADA SPRINGS SOLAR | 1798 | Solar+Battery | 250.0 MW | active | Inyo, California |
| YELLOW PINE 2 | 1341 | Solar+Battery | 250.0 MW | operational | Clark, Nevada |
| DANDELION HYBRID SOLAR | 2145 | Solar+Battery | 220.0 MW | withdrawn | Nye, Nevada |
| Grapevine 1 | 2238 | Solar | 204.6 MW | active | Nye, Nevada |
| Nelson Hills | 2237 | Solar | 204.6 MW | active | Nye, Nevada |
| Container | 2226 | Solar | 204.6 MW | active | Nye, Nevada |
| WATER ROCK SOLAR 1 | 1801 | Solar+Battery | 200.0 MW | active | Nye, Nevada |
| ROUGH HAT 2 | 1799 | Solar+Battery | 200.0 MW | active | Clark, Nevada |
| ROUGH HAT HYBRID SOLAR | 1650 | Solar+Battery | 200.0 MW | active | Nye, Nevada |
| ROCCASECCA BESS | 1347 | Battery | 126.6 MW | active | Clark, Nevada |
| Nelson | 2269 | Solar | 103.7 MW | active | Nye, Nevada |
| BLACK HILLS PLAYA A SOLAR | 1651 | Solar+Battery | 100.0 MW | withdrawn | Clark, Nevada |
| SNOW MOUNTAIN SOLAR | 1219 | Solar | 100.0 MW | withdrawn | Clark, Nevada |
| BLACK HILLS PLAYA B SOLAR | 1652 | Solar+Battery | 100.0 MW | withdrawn | Clark, Nevada |
| ARES NEVADA | 1064 | Battery | 44.0 MW | active | Nye, Nevada |
Recent material changes
No material field-level changes have been recorded against these projects since the baseline snapshot. interXdata records changes as new source snapshots are ingested and diffed.
Explore related data
Source last checked2026-07-31
Data last materially changed2026-08-27
Page data generated2026-08-27
Provenance: California ISO — public interconnection queue; Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Track queue activity connecting through GLW.
Start tracking with interXdata