Blackcat Storage (26INR0376)

Blackcat Storage is a 200.6 MW other interconnection project in Matagorda, Texas with a current status of operational. It is proposed to connect at 138kV Blackcat Substation (#80124).

200.6 MWCapacity
OperationalStatus
MatagordaMarket
OtherTechnology

Project facts

Canonical nameBlackcat Storage
Queue ID26INR0376
Statusoperational
Source statusSS Completed, FIS Started, No IA
MarketMatagorda
TechnologyOther
Capacity200.6 MW
StateTexas
CountyMatagorda
Point of interconnection138kV Blackcat Substation (#80124)
Requested (queue) date2024-01-11
Proposed in-service date
Operational date2027-12-31
Withdrawn date
DeveloperMatagorda ESS, LLC
Utility / transmission ownerERCOT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-27

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata