Matagorda County, Texas — Interconnection Projects

The interXdata warehouse tracks 63 interconnection projects in Matagorda, Texas, representing 13,042 MW of requested capacity.

63Total projects
11Active
40Operational
11Withdrawn
13,042 MWRequested capacity

Technology mix

TechnologyProjectsRequested capacity
Other236,317 MW
Solar224,491 MW
Battery101,308 MW
Wind4912 MW
Nuclear113 MW
Gas31 MW

Projects

ProjectQueue IDTechnologyCapacityStatusLocation
South Texas Project6251_1Other1,354.3 MWoperationalMatagorda, Texas
South Texas Project6251_2Other1,354.3 MWoperationalMatagorda, Texas
STP Unit2 High Pressure Turbine Upgrade27INR0557Other1,336.5 MWactiveMatagorda, Texas
Duffy Solar23INR0057Solar502.5 MWoperationalMatagorda, Texas
Bluefox Solar 127INR0141Solar402.6 MWoperationalMatagorda, Texas
Bluefox Solar 228INR0063Solar401.8 MWoperationalMatagorda, Texas
PALACWND23INR0257Wind366.6 MWwithdrawnMatagorda, Texas
Juanita Creek BESS29INR0151Battery303.6 MWsuspendedMatagorda, Texas
Charolais Solar21INR0380Solar261.6 MWoperationalMatagorda, Texas
Lavaca Bay Solar23INR0084Solar243.5 MWactiveMatagorda, Texas
Peyton Creek Wind Farm II67700_WT2Wind243.0 MWoperationalMatagorda, Texas
Peyton Creek Wind II20INR0155Other241.2 MWoperationalMatagorda, Texas
Duffy BESS26INR0250Other241.1 MWoperationalMatagorda, Texas
Razorbill Solar22INR0244Solar240.0 MWoperationalMatagorda, Texas
Duffy BESS69295_DFBSSBattery235.9 MWactiveMatagorda, Texas
Ventures BESS67783_GRS12Battery226.8 MWactiveMatagorda, Texas
Shoshana Storage23INR0466Other221.0 MWoperationalMatagorda, Texas
Solar Star Bay City Storage27INR0120Other206.3 MWoperationalMatagorda, Texas
Running Iron Solar26INR0258Solar204.7 MWoperationalMatagorda, Texas
Bluefox Solar 328INR0064Solar201.8 MWoperationalMatagorda, Texas
Milwaukee Solar22INR0441Solar201.5 MWwithdrawnMatagorda, Texas
Clybourn Solar22INR0346Solar201.5 MWwithdrawnMatagorda, Texas
Eldora BESS24INR0338Other201.3 MWoperationalMatagorda, Texas
Elston Solar22INR0351Solar201.3 MWwithdrawnMatagorda, Texas
Eldora Solar24INR0337Solar200.9 MWoperationalMatagorda, Texas
Blackcat BESS67558_RIC96Battery200.6 MWactiveMatagorda, Texas
Blackcat Storage26INR0376Other200.6 MWoperationalMatagorda, Texas
Eldora Energy LLC65847_ELDBSBattery200.0 MWactiveMatagorda, Texas
Eldora Energy LLC65847_ELDPVSolar200.0 MWactiveMatagorda, Texas
Percy Farm Solar24INR0020Solar198.6 MWoperationalMatagorda, Texas
Live Oak Bayou Solar SLF27INR0021Solar156.1 MWwithdrawnMatagorda, Texas
Bastion BESS28INR0341Other154.3 MWoperationalMatagorda, Texas
Peyton Creek Wind18INR0018Wind151.2 MWoperationalMatagorda, Texas
Peyton Creek Wind Farm LLC62417_WT1Wind151.2 MWoperationalMatagorda, Texas
Charolais Storage23INR0168Other150.0 MWoperationalMatagorda, Texas
Evergreen Solar23INR0100Solar150.0 MWwithdrawnMatagorda, Texas
Midfield PV Project SLF26INR0347Solar150.0 MWoperationalMatagorda, Texas
Thickgrass Solar20INR0133Solar148.7 MWwithdrawnMatagorda, Texas
City Breeze BESS25INR0271Other143.1 MWoperationalMatagorda, Texas
Razorbill Storage22INR0382Other120.0 MWoperationalMatagorda, Texas
Post Trail Energy26INR0429Other103.5 MWoperationalMatagorda, Texas
Palacios Bay Energy Storage25INR0544Battery101.2 MWwithdrawnMatagorda, Texas
Matagorda Solar22INR0342Solar101.0 MWoperationalMatagorda, Texas
Pledgor BESS25INR0405Other100.3 MWoperationalMatagorda, Texas
Evergreen Storage24INR0335Other100.0 MWwithdrawnMatagorda, Texas
Isaac Solar68380_ISCPVSolar51.4 MWactiveMatagorda, Texas
Isaac Solar25INR0232Solar50.7 MWoperationalMatagorda, Texas
City Breeze II BESS25INR0496Other40.4 MWwithdrawnMatagorda, Texas
ARCHER Solar 223INR0221Solar20.4 MWwithdrawnMatagorda, Texas
STP Unit 1 repower20INR0287Nuclear13.0 MWoperationalMatagorda, Texas
Matagorda Clean Energy Center (BESS)69866_MGBA1Battery10.1 MWactiveMatagorda, Texas
SMT Bay City LLC66930_SMTBCBattery10.0 MWoperationalMatagorda, Texas
Bay City BESS23INR0507Other10.0 MWoperationalMatagorda, Texas
Pavlov BESS226INR0714Other10.0 MWactiveMatagorda, Texas
Pavlov67493_PAVLVBattery9.9 MWoperationalMatagorda, Texas
Regis Palacios69302_PALACBattery9.9 MWoperationalMatagorda, Texas
Regis Palacios BESS22INR0602Other9.9 MWoperationalMatagorda, Texas
Pavlov BESS24INR0615Other9.9 MWoperationalMatagorda, Texas
Pledger BESS25INR0604Other9.5 MWactiveMatagorda, Texas
HEB0029265026_H2922Gas0.4 MWoperationalMatagorda, Texas

Top developers

Explore related data

Source last checked2026-07-31
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned); ERCOT — Generation Interconnection Status (GIS) report; Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Get an alert when a new project is proposed in Matagorda County.

Start tracking with interXdata