Blevins Storage (23INR0119)
Blevins Storage is a 181.3 MW battery interconnection project in Falls, Texas with a current status of operational. It is proposed to connect at Tap Bellfalls Switch (3404) – Lake Creek Switch (3409).
181.3 MWCapacity
OperationalStatus
ERCOTMarket
BatteryTechnology
Project facts
| Canonical name | Blevins Storage |
|---|---|
| Queue ID | 23INR0119 |
| Status | operational |
| Source status | operational |
| Market | ERCOT |
| Technology | Battery |
| Capacity | 181.3 MW |
| State | Texas |
| County | Falls |
| Point of interconnection | Tap Bellfalls Switch (3404) – Lake Creek Switch (3409) |
| Requested (queue) date | 2021-02-03 |
| Proposed in-service date | 2025-11-26 |
| Operational date | 2025-11-26 |
| Withdrawn date | — |
| Developer | Blevins Solar, LLC |
| Utility / transmission owner | ERCOT |
What changed
No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.
Explore related data
Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27
Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata