Blue Bird Solar (24INR0075)

Blue Bird Solar is a 773.0 MW solar interconnection project in Johnson, Texas with a current status of operational. It is proposed to connect at tap 345kV 1880 Rocky Creek - 1898 Mitchell Bend Switch .

773.0 MWCapacity
OperationalStatus
JohnsonMarket
SolarTechnology

Project facts

Canonical nameBlue Bird Solar
Queue ID24INR0075
Statusoperational
Source statusSS Completed, FIS Started, IA
MarketJohnson
TechnologySolar
Capacity773.0 MW
StateTexas
CountyJohnson
Point of interconnectiontap 345kV 1880 Rocky Creek - 1898 Mitchell Bend Switch
Requested (queue) date2021-11-10
Proposed in-service date
Operational date2028-12-15
Withdrawn date
DeveloperGigawatt Solar LLC
Utility / transmission ownerERCOT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-27

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.