Johnson County, Texas — Interconnection Projects
The interXdata warehouse tracks 6 interconnection projects in Johnson, Texas, representing 2,222 MW of requested capacity.
6Total projects
0Active
4Operational
2Withdrawn
2,222 MWRequested capacity
Technology mix
| Technology | Projects | Requested capacity |
|---|---|---|
| Solar | 2 | 1,275 MW |
| Battery | 1 | 462 MW |
| Gas | 2 | 283 MW |
| Other | 1 | 203 MW |
Projects
| Project | Queue ID | Technology | Capacity | Status | Location |
|---|---|---|---|---|---|
| Blue Bird Solar | 24INR0075 | Solar | 773.0 MW | operational | Johnson, Texas |
| Green Bird Solar | 24INR0076 | Solar | 502.0 MW | withdrawn | Johnson, Texas |
| Upstream BESS | 26INR0106 | Battery | 461.6 MW | withdrawn | Johnson, Texas |
| Trenno BESS | 27INR0173 | Other | 202.6 MW | operational | Johnson, Texas |
| Johnson County | 54817_GT-1 | Gas | 178.2 MW | operational | Johnson, Texas |
| Johnson County | 54817_ST-1 | Gas | 104.4 MW | operational | Johnson, Texas |
Top developers
| Developer (canonical) | Projects | Capacity |
|---|---|---|
| Gigawatt Solar LLC | 2 | 1,275 MW |
| JSB1, LLC | 1 | 203 MW |
| Upstream Storage LLC | 1 | 462 MW |
Explore related data
Source last checked2026-07-31
Data last materially changed2026-08-27
Page data generated2026-08-27
Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned); ERCOT — Generation Interconnection Status (GIS) report; Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Get an alert when a new project is proposed in Johnson County.
Start tracking with interXdata