Blue Frost Storage II (C24-199)

Blue Frost Storage II is a 200.0 MW battery interconnection project in Montgomery, New York with a current status of withdrawn. It is proposed to connect at Edic - Gordon Road 345kV Line 14.

200.0 MWCapacity
WithdrawnStatus
NYISOMarket
BatteryTechnology

Project facts

Canonical nameBlue Frost Storage II
Queue IDC24-199
Statuswithdrawn
Source statuswithdrawn
MarketNYISO
TechnologyBattery
Capacity200.0 MW
StateNew York
CountyMontgomery
Point of interconnectionEdic - Gordon Road 345kV Line 14
Requested (queue) date2024-09-19
Proposed in-service date
Operational date
Withdrawn date
DeveloperBlue Frost Energy Center, LLC
Utility / transmission ownerNM-NG

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata