Blue Frost Storage II (C24-199)
Blue Frost Storage II is a 200.0 MW battery interconnection project in Montgomery, New York with a current status of withdrawn. It is proposed to connect at Edic - Gordon Road 345kV Line 14.
200.0 MWCapacity
WithdrawnStatus
NYISOMarket
BatteryTechnology
Project facts
| Canonical name | Blue Frost Storage II |
|---|---|
| Queue ID | C24-199 |
| Status | withdrawn |
| Source status | withdrawn |
| Market | NYISO |
| Technology | Battery |
| Capacity | 200.0 MW |
| State | New York |
| County | Montgomery |
| Point of interconnection | Edic - Gordon Road 345kV Line 14 |
| Requested (queue) date | 2024-09-19 |
| Proposed in-service date | — |
| Operational date | — |
| Withdrawn date | — |
| Developer | Blue Frost Energy Center, LLC |
| Utility / transmission owner | NM-NG |
What changed
No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.
Explore related data
Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27
Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.