Blue Jay BESS (23INR0019)
Blue Jay BESS is a 51.6 MW other interconnection project in Grimes, Texas with a current status of operational. It is proposed to connect at 4 IOLA 138kV.
51.6 MWCapacity
OperationalStatus
ERCOTMarket
OtherTechnology
Project facts
| Canonical name | Blue Jay BESS |
|---|---|
| Queue ID | 23INR0019 |
| Status | operational |
| Source status | operational |
| Market | ERCOT |
| Technology | Other |
| Capacity | 51.6 MW |
| State | Texas |
| County | Grimes |
| Point of interconnection | 4 IOLA 138kV |
| Requested (queue) date | 2020-01-05 |
| Proposed in-service date | 2023-06-30 |
| Operational date | 2023-06-30 |
| Withdrawn date | — |
| Developer | Blue Jay Solar I, LLC |
| Utility / transmission owner | ERCOT |
What changed
No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.
Explore related data
Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27
Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.