Blue Summit II Wind (61970_BSII)

Blue Summit II Wind is a 99.4 MW wind interconnection project in Wilbarger, Texas with a current status of operational.

99.4 MWCapacity
OperationalStatus
ERCOMarket
WindTechnology

Project facts

Canonical nameBlue Summit II Wind
Queue ID61970_BSII
Statusoperational
Source status(OP) Operating
MarketERCO
TechnologyWind
Capacity99.4 MW
StateTexas
CountyWilbarger
Point of interconnection
Requested (queue) date
Proposed in-service date
Operational date2019-01-01
Withdrawn date
Developer
Utility / transmission ownerBlue Summit III Wind, LLC

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_projectoperationalhigh

Explore related data

Source last checked2026-08-03
Data last materially changed2026-08-03
Page data generated2026-08-27

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.