Blue Summit III Wind, LLC — Interconnection Queue Projects
Blue Summit III Wind, LLC is associated with 3 tracked interconnection projects representing 435 MW of requested capacity.
Entity resolution: this utility / transmission entity rolls up 3 source organization name(s) that were auto-matched into a single canonical cluster. Attribution is inferred from source records and may include related special-purpose entities.
Capacity by technology
| Technology | Projects | Requested capacity |
|---|---|---|
| Wind | 3 | 435 MW |
Geographic footprint
| State | Projects |
|---|---|
| Texas | 3 |
Projects
| Project | Queue ID | Technology | Capacity | Status | Location |
|---|---|---|---|---|---|
| Blue Summit III Wind | 62566_BS3 | Wind | 200.2 MW | operational | Hardeman, Texas |
| Blue Summit Wind LLC | 58372_GEN1 | Wind | 135.4 MW | operational | Wilbarger, Texas |
| Blue Summit II Wind | 61970_BSII | Wind | 99.4 MW | operational | Wilbarger, Texas |
Recent material changes
No material field-level changes have been recorded against these projects since the baseline snapshot. interXdata records changes as new source snapshots are ingested and diffed.
Explore related data
Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.