Blue Summit Wind III (19INR0182)

Blue Summit Wind III is a 200.2 MW wind+battery interconnection project in Wilbarger, Texas with a current status of operational. It is proposed to connect at 61001 Jim Treece 345kV.

200.2 MWCapacity
OperationalStatus
ERCOTMarket
Wind+BatteryTechnology

Project facts

Canonical nameBlue Summit Wind III
Queue ID19INR0182
Statusoperational
Source statusoperational
MarketERCOT
TechnologyWind+Battery
Capacity200.2 MW
StateTexas
CountyWilbarger
Point of interconnection61001 Jim Treece 345kV
Requested (queue) date2018-06-05
Proposed in-service date2020-09-30
Operational date2019-11-14
Withdrawn date
DeveloperNextera
Utility / transmission ownerERCOT

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.