BMP Wind (TX) (62809_BMP)

BMP Wind (TX) is a 340.0 MW wind interconnection project in Callahan, Texas with a current status of operational.

340.0 MWCapacity
OperationalStatus
ERCOMarket
WindTechnology

Project facts

Canonical nameBMP Wind (TX)
Queue ID62809_BMP
Statusoperational
Source status(OP) Operating
MarketERCO
TechnologyWind
Capacity340.0 MW
StateTexas
CountyCallahan
Point of interconnection—
Requested (queue) date—
Proposed in-service date—
Operational date2021-12-01
Withdrawn date—
Developer—
Utility / transmission ownerBMP Wind, LLC

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_project—operationalhigh

Explore related data

Source last checked2026-10-02
Data last materially changed2026-10-02
Page data generated2026-10-12

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.