Callahan County, Texas — Interconnection Projects
The interXdata warehouse tracks 17 interconnection projects in Callahan, Texas, representing 3,912 MW of requested capacity.
17Total projects
2Active
11Operational
4Withdrawn
3,912 MWRequested capacity
Technology mix
| Technology | Projects | Requested capacity |
|---|---|---|
| Solar | 4 | 1,637 MW |
| Other | 5 | 1,199 MW |
| Wind | 7 | 1,003 MW |
| Battery | 1 | 73 MW |
Projects
| Project | Queue ID | Technology | Capacity | Status | Location |
|---|---|---|---|---|---|
| Sequoia II Solar | 22INR0262 | Solar | 417.5 MW | operational | Callahan, Texas |
| Enbridge Solar (Sequoia II) | 69272_SEQII | Solar | 415.0 MW | active | Callahan, Texas |
| Hittson Creek Solar | 28INR0245 | Solar | 402.9 MW | operational | Callahan, Texas |
| Dorado Solar | 22INR0261 | Solar | 401.4 MW | active | Callahan, Texas |
| BMP Wind (TX) | 62809_BMP | Wind | 340.0 MW | operational | Callahan, Texas |
| Baird North Wind | 20INR0083 | Other | 340.0 MW | operational | Callahan, Texas |
| Box Canyon Energy Storage | 25INR0209 | Other | 306.3 MW | withdrawn | Callahan, Texas |
| Hittson Creek BESS | 28INR0246 | Other | 205.4 MW | operational | Callahan, Texas |
| Guitar BESS | 25INR0446 | Other | 204.8 MW | operational | Callahan, Texas |
| Sheep Creek Wind | 21INR0325 | Wind | 153.0 MW | operational | Callahan, Texas |
| Ranchland Wind Project II | 64544_WT2 | Wind | 148.0 MW | operational | Callahan, Texas |
| Sheep Creek Storage | 24INR0100 | Other | 142.1 MW | operational | Callahan, Texas |
| Century Oak Wind | 20INR0048 | Wind | 126.0 MW | withdrawn | Callahan, Texas |
| Ranchland Wind Project I | 64551_WT2 | Wind | 114.9 MW | operational | Callahan, Texas |
| Kaiser Creek Wind | 18INR0042 | Wind | 101.5 MW | withdrawn | Callahan, Texas |
| Ranchland Wind Storage | 64545_BA | Battery | 73.0 MW | operational | Callahan, Texas |
| Baird North II Wind | 21INR0498 | Wind | 20.0 MW | withdrawn | Callahan, Texas |
Top developers
| Developer (canonical) | Projects | Capacity |
|---|---|---|
| 174 Power Global Properties | 2 | 608 MW |
| Enbridge Ingleside Solar, LLC | 2 | 819 MW |
| BMP Wind, LLC | 2 | 360 MW |
| Guitar BESS LLC | 1 | 205 MW |
| Century Oak Wind Project, LLC | 1 | 153 MW |
| Calpine Energy Services, L.P. | 1 | 102 MW |
| ENGIE IR Holdings LLC | 1 | 126 MW |
| Box Canyon Energy Storage Project, LLC | 1 | 306 MW |
| Longhorn Storage LLC | 1 | 142 MW |
Explore related data
Source last checked2026-07-31
Data last materially changed2026-08-27
Page data generated2026-08-27
Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned); ERCOT — Generation Interconnection Status (GIS) report; Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Get an alert when a new project is proposed in Callahan County.
Start tracking with interXdata