Bobcat Bluff repower (18INR0078)

Bobcat Bluff repower is a 12.0 MW wind interconnection project in Archer, Texas with a current status of operational.

12.0 MWCapacity
OperationalStatus
ERCOTMarket
WindTechnology

Project facts

Canonical nameBobcat Bluff repower
Queue ID18INR0078
Statusoperational
Source statusoperational
MarketERCOT
TechnologyWind
Capacity12.0 MW
StateTexas
CountyArcher
Point of interconnection
Requested (queue) date2018-05-14
Proposed in-service date
Operational date2020-04-17
Withdrawn date
Developer
Utility / transmission ownerERCOT

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-28

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata