Bonanza 115 kV is a 50.0 MW other interconnection project in Crook, Oregon with a current status of active. It is proposed to connect at BPA's Bonanza Substation (planned).
50.0 MWCapacity
ActiveStatus
ORMarket
OtherTechnology
Project facts
| Canonical name | Bonanza 115 kV |
|---|---|
| Queue ID | L0588 |
| Status | active |
| Source status | STUDY |
| Market | OR |
| Technology | Other |
| Capacity | 50.0 MW |
| State | Oregon |
| County | Crook |
| Point of interconnection | BPA's Bonanza Substation (planned) |
| Requested (queue) date | 2023-12-14 |
| Proposed in-service date | 2026-12-20 |
| Operational date | — |
| Withdrawn date | — |
| Developer | Central Electric Cooperative, Inc. |
| Utility / transmission owner | Bonneville Power Administration |
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-04 | new_project | — | active | high |
Explore related data
Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27
Provenance: bpa-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata