Bonita Creek Solar is a 200.0 MW solar interconnection project in Atascosa, Texas with a current status of withdrawn. It is proposed to connect at tap 345kV 5133 Elm Creek - 5901 San Miguel.

200.0 MWCapacity
WithdrawnStatus
ERCOTMarket
SolarTechnology

Project facts

Canonical nameBonita Creek Solar
Queue ID23INR0065
Statuswithdrawn
Source statuswithdrawn
MarketERCOT
TechnologySolar
Capacity200.0 MW
StateTexas
CountyAtascosa
Point of interconnectiontap 345kV 5133 Elm Creek - 5901 San Miguel
Requested (queue) date2020-12-02
Proposed in-service date2026-12-31
Operational date
Withdrawn date2024-12-20
DeveloperInvenergy
Utility / transmission ownerERCOT

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata