Bottom Grass BESS MW Increase (23INR0098)
Bottom Grass BESS MW Increase is a 101.4 MW other interconnection project in Colorado, Texas with a current status of withdrawn. It is proposed to connect at tap 345 kV 9073 Holman - 44200 Hillje.
101.4 MWCapacity
WithdrawnStatus
ERCOTMarket
OtherTechnology
Project facts
| Canonical name | Bottom Grass BESS MW Increase |
|---|---|
| Queue ID | 23INR0098 |
| Status | withdrawn |
| Source status | withdrawn |
| Market | ERCOT |
| Technology | Other |
| Capacity | 101.4 MW |
| State | Texas |
| County | Colorado |
| Point of interconnection | tap 345 kV 9073 Holman - 44200 Hillje |
| Requested (queue) date | — |
| Proposed in-service date | 2023-07-01 |
| Operational date | — |
| Withdrawn date | 2020-12-16 |
| Developer | Bottom Grass Solar Project, LLC |
| Utility / transmission owner | ERCOT |
What changed
No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.
Explore related data
Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-28
Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata