BOULDER SOLAR 3 (FKA: BOULDER SOLAR POWER C7) (1069)

BOULDER SOLAR 3 (FKA: BOULDER SOLAR POWER C7) is a 250.0 MW solar interconnection project in Clark, Nevada with a current status of withdrawn. It is proposed to connect at SCE owned Eldorado 220 kV bus.

250.0 MWCapacity
WithdrawnStatus
Market
SolarTechnology

Project facts

Canonical nameBOULDER SOLAR 3 (FKA: BOULDER SOLAR POWER C7)
Queue ID1069
Statuswithdrawn
Source statusWITHDRAWN
Market
TechnologySolar
Capacity250.0 MW
StateNevada
CountyClark
Point of interconnectionSCE owned Eldorado 220 kV bus
Requested (queue) date2014-04-30
Proposed in-service date
Operational date
Withdrawn date2016-12-29
Developer
Utility / transmission ownerSCE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: California ISO — public interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata