Bowers 115 kV Substation (GEN-2024-368)

Bowers 115 kV Substation is a 250.0 MW battery interconnection project in Gray, Texas with a current status of withdrawn. It is proposed to connect at Bowers 115 kV Substation.

250.0 MWCapacity
WithdrawnStatus
TXMarket
BatteryTechnology

Project facts

Canonical nameBowers 115 kV Substation
Queue IDGEN-2024-368
Statuswithdrawn
Source statusWITHDRAWN
MarketTX
TechnologyBattery
Capacity250.0 MW
StateTexas
CountyGray
Point of interconnectionBowers 115 kV Substation
Requested (queue) date2025-03-01
Proposed in-service date2028-03-01
Operational date
Withdrawn date2026-05-21
Developer
Utility / transmission ownerSPS

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-28
Data last materially changed2026-08-28
Page data generated2026-08-28

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.