Gray County, Texas — Interconnection Projects
The interXdata warehouse tracks 6 interconnection projects in Gray, Texas, representing 3,120 MW of requested capacity.
6Total projects
1Active
3Operational
1Withdrawn
3,120 MWRequested capacity
Technology mix
| Technology | Projects | Requested capacity |
|---|---|---|
| Other | 2 | 1,418 MW |
| Solar | 2 | 1,203 MW |
| Battery | 1 | 250 MW |
| Wind | 1 | 249 MW |
Projects
| Project | Queue ID | Technology | Capacity | Status | Location |
|---|---|---|---|---|---|
| Meitner 2 Wind | 29INR0103 | Other | 709.1 MW | operational | Gray, Texas |
| Meitner Wind | 26INR0113 | Other | 709.0 MW | operational | Gray, Texas |
| Meitner Solar | 25INR0080 | Solar | 702.6 MW | operational | Gray, Texas |
| IP Meitner Solar | 68203_MEITS | Solar | 500.0 MW | active | Gray, Texas |
| Bowers 115 kV Substation | GEN-2024-368 | Battery | 250.0 MW | withdrawn | Gray, Texas |
| Grandview 5 W | 08INR0019b | Wind | 249.0 MW | suspended | Gray, Texas |
Top developers
| Developer (canonical) | Projects | Capacity |
|---|---|---|
| IP Meitner, LLC | 3 | 2,121 MW |
| Eon | 1 | 249 MW |
Explore related data
Source last checked2026-07-31
Data last materially changed2026-08-27
Page data generated2026-08-27
Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned); ERCOT — Generation Interconnection Status (GIS) report; Lawrence Berkeley National Laboratory — Queued Up interconnection dataset; Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.