Gray County, Texas — Interconnection Projects

The interXdata warehouse tracks 6 interconnection projects in Gray, Texas, representing 3,120 MW of requested capacity.

6Total projects
1Active
3Operational
1Withdrawn
3,120 MWRequested capacity

Technology mix

TechnologyProjectsRequested capacity
Other21,418 MW
Solar21,203 MW
Battery1250 MW
Wind1249 MW

Projects

ProjectQueue IDTechnologyCapacityStatusLocation
Meitner 2 Wind29INR0103Other709.1 MWoperationalGray, Texas
Meitner Wind26INR0113Other709.0 MWoperationalGray, Texas
Meitner Solar25INR0080Solar702.6 MWoperationalGray, Texas
IP Meitner Solar68203_MEITSSolar500.0 MWactiveGray, Texas
Bowers 115 kV SubstationGEN-2024-368Battery250.0 MWwithdrawnGray, Texas
Grandview 5 W08INR0019bWind249.0 MWsuspendedGray, Texas

Top developers

Developer (canonical)ProjectsCapacity
IP Meitner, LLC32,121 MW
Eon1249 MW

Explore related data

Source last checked2026-07-31
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned); ERCOT — Generation Interconnection Status (GIS) report; Lawrence Berkeley National Laboratory — Queued Up interconnection dataset; Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Get an alert when a new project is proposed in Gray County.

Start tracking with interXdata